Pedestrian tunnel maintenance on University Drive West
Transportation Operations will be continuing bridge maintenance by working on the pedestrian tunnel over University Drive West. The work is expected to be completed by end of day, August 9, weather permitting.
The work will require a single-lane closure of the south and northbound lanes.
Signage will be in place and motorists are advised to drive with caution and observe the on-site posted speed and all other construction signs.
Find City of Lethbridge road notices here.
Contact Us
City Hall
910 4 Avenue South
Lethbridge, AB T1J 0P6
Phone: 311
or 403-320-3111 (if outside of Lethbridge)